Perfect Installs
Roof replacement
Full tear-off and a new tile, shingle, metal or flat roof, installed by our own crew and backed by a 12-year workmanship warranty.
Details
Your all-inclusive roofer
Permits, tear-off, repairs, new roof, clean-up and a 12-year workmanship warranty, all from one crew.
Who we are
From Broward to Boca to the Palm Beaches, we’re the family-run roofer your neighbors call. Every roof we replace gets the same four steps before a single tile, shingle or metal panel goes down.
Selected work
Every photo is a Glades Edge job, captioned with the neighborhood, the material and the stage it was at that day.
See the full gallery
Services
Perfect Installs
Full tear-off and a new tile, shingle, metal or flat roof, installed by our own crew and backed by a 12-year workmanship warranty.
Details
Reliable Upgrades
Switch materials, add seamless gutters or move to a cooler, more efficient roof. We compare six roofing types with you before anything is ordered.
Details
Upkeep & Repair
Leaks, cracked or slipped tile, lifted shingles, flashing and flat-roof patches, found early and fixed properly. Repair inspections are free.
DetailsAnatomy of a roof
Scroll to watch a roof go on, in the same order we build yours.
We tear off to the deck and check every sheet. Rotten wood and damaged fascia are replaced, so everything above is fastened to solid, flat wood.
A peel-and-stick membrane (Polyglass) is rolled out from the eave to the ridge and bonded straight to the deck. It is the layer that keeps water out if the roof covering is ever damaged.
Drip edge goes on at the eaves, then metal in every valley and along every ridge and hip. Those are the lines where water collects or sheds fastest, so they are sealed before any tile goes on.
Tile is laid course by course from the eave up to the ridge and cut back along the valleys. Caps finish the ridge and hips, and seamless gutters carry the water away.
Anatomy of a roof
Four layers go on every roof we replace, in this order.
01
We tear off to the deck and check every sheet. Rotten wood and damaged fascia are replaced, so everything above is fastened to solid, flat wood.
02
A peel-and-stick membrane (Polyglass) is rolled out from the eave to the ridge and bonded straight to the deck. It is the layer that keeps water out if the roof covering is ever damaged.
03
Drip edge goes on at the eaves, then metal in every valley and along every ridge and hip. Those are the lines where water collects or sheds fastest, so they are sealed before any tile goes on.
04
Tile is laid course by course from the eave up to the ridge and cut back along the valleys. Caps finish the ridge and hips, and seamless gutters carry the water away.
How every roof goes on
The same four steps on every replacement, before a single tile, shingle or metal panel is laid.
Hawks Landing, PlantationFirst day of prep
The old roof comes off down to the deck and goes straight into our trucks. Nothing new is laid over old problems.
Tear off and prep
With the deck bare, we check every sheet of wood and show you what we find before anything is covered.
Shingle re-roof in progress
Rotten wood and damaged fascia are replaced, so the new roof is fastened to sound wood.
Hawks Landing, PlantationDry-in complete, ready for tile
A fully adhered Polyglass water barrier seals the deck. Then the tile, shingle or metal goes on.
The owner
Brian started Glades Edge Roofing to run the kind of company he would want working on his own house.
He brought together experienced crews and still does the part many owners hand off: he meets homeowners in person, walks the roof, explains every option and answers the phone long after the contract is signed. Living and working on the coast gave him a particular respect for storm-damaged homes, and a preference for repairs that are quick, efficient and transparent.
Customers notice: most of our reviews mention him by name.
More about us“He was the only one that personally came out and didn’t just send a quote through email.”
In their words
4.9 Rated on Google (opens in a new tab)FAQ
Permits, tear-off, replacement of any rotten wood or damaged fascia, the new roof, clean-up after the job and our 12-year workmanship warranty, all from one crew.
Yes. Quotes are free and done in person at your home, so you get real measurements and a real conversation instead of a number in an email.
Yes. A detailed roof inspection for your insurer is $75. Filing the paperwork directly with your insurance company is an additional fee.
Not if they are in good shape. We can work around them. If they need replacing, we install seamless gutters.
We stand by our work. If a roof we installed leaks, we cover the repair to the roof and any damage the leak caused, and every new roof carries our 12-year workmanship warranty.
Yes. Glades Edge Roofing is a State of Florida Certified Roofing Contractor, license CCC1334004, and is fully insured.
Free quote
Quotes are free and done in person. Send the details and we’ll call to set a time that suits you.
12-year workmanship warranty on every new roof